Services/05/Stake Out Survey
05

Stake Out Survey

Transfers architectural and structural design coordinates onto the ground so contractors can excavate and build exactly where intended.

[ A ]   Deliverables

  • D.01Staked reference points on site
  • D.02Layout report with offsets
  • D.03Coordination sheet for site engineer

[ B ]   Process

  1. 01

    Plan Ingestion

    Approved architectural/structural drawings imported to CAD.

  2. 02

    Coordinate Transfer

    Design geometry rotated to survey datum.

  3. 03

    Field Layout

    Total station transfers points to ground with physical stakes.

  4. 04

    Turnover

    As-staked report signed and issued to contractor.